Substation BIM Model – Context
A substation upgrade project introduced new indoor equipment and supporting auxiliary systems, which in turn required multi-discipline coordination and IFC documentation.
Role
BIM Coordinator + Modeller.
Work
Built and standardised families (Revit + AutoCAD), modelled in Revit, set up geolocation and federation, prepared deliverables planning, coordinated with a supporting modeller, and validated model exchange via Navisworks testing and ProjectWise federation.
Deliverables
Federated models, BEP, and ~40 detailed construction drawings (IFC).
Numbers
~2 months • team of 2 • ~40 drawings.
Outcome
Established a practical BIM modelling workflow with reusability after previous attempts had been costly and delivered limited long-term value.
Related Services
If you need IFC-ready BIM delivery and a workflow your team can reuse, send your situation:
Get in Touch

